ASTIR PALACE, THE REBIRTH OF THE JEWEL OF THE ATHENIAN RIVIERA
VETA together with Mitras Artistic Metalwork contributed to the renovation of Four Seasons Astir Palace Hotel.
THE REQUEST
To design and Manufacture some of the most challenging elements of ARION & NAFSIKA hotels, bungalows, restaurants and lounge bars. Such as the multi-material bath doors, the polished stainless steel and old brass lift doors and wall panels over 7 meters in one piece.
HOW WE DID IT
The engineering team with advanced DFMA (Design for Manufacturing and Assembly) skills worked together with the manufacturing team and state of the art machines with the aim to make reality the drawings some of the best worldwide architects. Worked with a variety of materials to make high-quality constructions focused on details.