10/1/2019
THE LOUVRE MUSEUM.VETA AND MUEVO STRATEGICALLY ENGINEERED,MANUFACTURED AND INSTALLED MUSEUM SHOWCASES.
Veta,est.1967, together with Muevo which counts two years of life, built a new infrastructure and showcases for ancient artifacts, following the strict standards of the French museum as well as a newly presented collection.
All of the implemented engineering design was based upon the museological study of the Louvre and the lighting of its rooms. All work was done within the museum during working hours. Keeping up with the pace of the Louvre Museum, a museum that does not stop moving was equally as challenging as the size of the opportunity.
The next work phase will be at the "Richelieu" venue at the Louvre Museum.